How 30 Story Building Completed In Just 15 Days



Did you know how to build 30 story tower completed in just 15 days? Thanks to prefabricated parts which allowed Broad Sustainable Building company to build the T30 hotel in just 15 days.

#8. Overview - 30 Story Building Built In 15 Days

#8. Overview - 30 Story Building Built In 15 Days

Did you know, how 30 storey building completed in 15 days? Thanks to prefabricated parts which allowed Broad Sustainable Building company to build the T30 hotel in just 15 days.
Broad Sustainable Building is a prefab building company. The company built the T30 hotel in china in just 15 days with the help of 200 construction worker. And the company claims that the 17,000 square meters tower greatly reduces the material and energy waste as it reduces the cost and construction time.
The company made 93% of this hotel in their factory. Thay made the main board is 3.9X15.6 meters, it included everything such as lights, water pipes, kitchen sink and all the other things needed. They spent about 45 days to finish preparing all the basic blocks for the T30 hotel which exist near their factory. Then they trucked all the prefabricated parts to the construction site and built the whole tower in 15 days. While building process, they didn't use any water, dust or welding.
Don't forget to watch video on #1 page.

#7. They Used Identical Modules

#7. They Used Identical Modules

The floors and ceilings of the skyscraper are built in sections, each measuring 15.6 by 3.9 meters, with a depth of 45 centimeters.

#6. Preinstalled fixtures

#6. Preinstalled fixtures

Pipes and ducts are threaded through each floor module while it's still in the factory. The client's choice of flooring is also pre-installed on top.

#5. Standardized truckloads

#5. Standardized truckloads

Each load carries two modules to the site, with the necessary columns, bolts, tools, and other peripherals to connect them stacked on top of each.

#4. Instant Assembly

#4. Instant Assembly

Each section is lifted by crane directly to the top of the building. Workers use the materials on the module to quickly connect the pipes and wires.

#3. Snap-in columns

#3. Snap-in columns

Broad's design has aced 9.0-magnitude earthquake tests. The reason: this unique column design, with diagonal bracing at each end and tabs that bolt into the floors above and below.

#2. A Smooth Finish

#2. A Smooth Finish

In the final step, heavily insulated exterior walls and windows are slotted in by crane. The result is far from pretty, but the method is surprisingly safe—and phenomenally fast.

#1. Watch Video - 30 Story Building Built In 15 Days (Time Lapse)






Comments :


What’s Popular Now :


>> VIDEO: At First It Looks Like An Ordinary Van. But What It Transforms Into With A Push Of A...
>> Man Hiding Under Car Grabs Dying Orlando Victim and Says 'I Don't Know If You're Religious Or Not, But..'
>> Massaging These Areas Of Your Dog Maybe Crucial To Their Health. I Had No Idea.
>> AMAZON RAINFOREST ARE DISAPPEARING AND THE REASON BEHIND THAT IS SHOCKING
>> People Share Chilling Horror Stories That Actually Happened To Them. Truth Is Scarier Than Fiction
>> The Most Terrifying Gang In The World In Pictures
>> 13 Vandalized Signs That Nearly Make Us Feel Guilty For Laughing.
>> People Told Her To Remove Her Birthmark, But She Chose To Embrace It Instead.
>> Avoid These 10 Foods That Cause Headaches
>> If You Think This Woman Is The Subject Of These Photos, Look Again, Look Past Her And A Terrible Truth Will Unfold Before Your Eyes


296